Client Ministry of Physical Infrastructure &Transport, Department of Road, Development cooperation Implementation Division
Location NarayanghatMugling Road Section
Completed On Sept 2018
Project Type Rock Netting / Rock Anchoring & Bio Engineering work
Category GOVERNMENT & SEMI-GOVERNMENT
Earlier Condition

Slope failures due to the natural hazards occurring both globally and locally, down slope movement of rock debris and soil in response to gravitational stresses in huge quantity blocking the Narayanghat-Mugling road traffic movement

Work Done

Rock Netting with ground anchor Slope preparation for rock netting with drapery systemat rocky portion with all vertical and horizontal cables and fittings Installation of earth /rock anchors of different sizes. Bio Engineering works (Slope preparation, grass, shrubs, treesplanting, bhujetroseeding, fascines with live pegs, mulching, jutenetting, bolster drain etc.)

Before

The Progress

After